Plan: S01-009
Plan Details
Apply Date:
03/09/2001
Applicant:
N/A
Description:
VILLAGE OFFICES
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2001 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 06/25/2001 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 08/29/2002 | COT - WATR - Design Plan Construction | Passed | {Activity date: 08/29/2002; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - TUCSON WATER APPROVAL} | |
| 08/15/2003 | SPECIAL INSPECTION - OTHER (Third Party) | Passed | {Activity date: 08/15/2003; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - } | |
| 08/15/2006 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 06/22/2006; Status: Denied; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2002-029 1. AS PER THE PLANS, PAGE 2, THE REQUIRED TWO (2) "RIGHT LANE MUST TURN RIGHT" (R3-7R) SIGNS AND POSTS ARE MISSING AND NEED TO BE INSTALLED. 2. AN ASSITIONAL "BEGIN RIGHT TURN LANE- YEILD TO BIKES" SIGN (R4-4/36" X 30") AND POST IS BEING REQUIRED AND NEEDS TO BE INSTALLED FOR THE NORTHBOUND TRAFFIC ON SWAN ROAD AT THE BEGINNING OF THE NEW RIGHT TURN DECELERATION LAND (STATION 6+75, PAGE 2 OF PLANS).} ; {Activity date: 08/15/2006; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - } |
|
| 10/11/2001 | COT - ENGR - Site - Assurance Release | Passed |