Plan Details

Status:
Approved
Type:
Capital Improvement Project
Apply Date:
05/22/2024
Applicant:
Raul
Description:
Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Architects:
  • Archer Western Construction
  • Carollo Engineers
  • Carollo Engineers, Inc.
  • CITY OF TUCSON REAL ESTATE DIVISION ATTN: PROPERTY MANAGEMENT
  • JDETTMER
  • Tucson Water
  • Tucson Water Planning & Engineering
Contractors:

Outstanding Plan Activity Conditions

Plan Number - CIP-0524-00017
Plan Description: Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Date Name Approved Comments
08/14/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. Not Approved
08/14/2024 SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. Not Approved A. LOCATIONS. B. FORMWORK AND MEMBER SIZES. C. REINFORCING STEEL. D. ANCHORS: CAST-IN AND POST-INSTALLED. E. CONCRETE MIX AND PLACEMENT. F. PROTECTION AND CURING PROCEDURES. G. PRECAST CONCRETE.
08/14/2024 Final Foundation Design calculations and drawings are required prior to PRE-SLAB INSPECTION. Not Approved Plans indicate FOUNDATION DESIGN IS PRELIMINARY UNTIL FINAL EQUIPMENT LOADS ARE SUBMITTED AND APPROVED.
08/14/2024 SPECIAL INSPECTION FOR POST INSTALLED ANCHORS IS REQUIRED. Not Approved ANCHORS - POST-INSTALLED MECHANICAL AND ADHESIVE.
08/14/2024 SPECIAL INSPECTION FOR SOILS IS REQUIRED. Not Approved A. EXCAVATION DEPTH. B. ADEQUACY OF EXPOSED SURFACE TO PROVIDE REQUIRED SUPPORT. C. PREPARATION OF SOILS/SURFACES SUPPORTING CONSTRUCTION. D. FILL AND BACKFILL.
08/14/2024 SPECIAL INSPECTION FOR STEEL CONSTRUCTION IS REQUIRED. Not Approved STRUCTURAL STEEL (CARBON AND STAINLESS). 1) HIGH-STRENGTH BOLTING. 2) WELDING.
08/14/2024 SPECIAL INSPECTION FOR STRUCTURAL ALUMINUM. IS REQUIRED. Not Approved 1) BOLTING. 2) WELDING
08/14/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. Not Approved A. LOCATIONS. B. MEMBER SIZES. C. REINFORCING STEEL. D. ANCHORS: BUILT-IN AND POST-INSTALLED. E. MORTAR AND JOINTS. F. GROUT AND GROUTING. G. PROTECTION AND CURING PROCEDURES.

Plan Reviews

Plan Number - CIP-0524-00017
Plan Status: Approved
Plan Description: Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Start Date Submittal Complete Date Status  
07/17/2024 CIP - Project Manager Review v.1 APPROVED Review Details
06/24/2024 CIP - Dev Site + Comm Structure - Initial v.1 APPROVED Review Details
10/21/2024 CIP - Dev Site + Comm Structure - Final v.2 REQUIRES RESUBMIT Review Details
07/17/2024 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
06/24/2024 CIP - Project Manager Review v.1 APPROVED Review Details
10/03/2024 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
10/31/2024 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
11/25/2024 CIP - Dev Site + Comm Structure - Final v.2 APPROVED Review Details