Plan: CIP-0524-00017
Plan Details
Status:
In review
Type:
Capital Improvement Project
Apply Date:
05/22/2024
Applicant:
Raul
Description:
Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Architects:
- Archer Western Construction
- Carollo Engineers
- Carollo Engineers, Inc.
- City of Tucson
- CITY OF TUCSON REAL ESTATE DIVISION ATTN: PROPERTY MANAGEMENT
- Tucson Water
Contractors:
Outstanding Plan Activity Conditions
Plan Number - CIP-0524-00017
Plan Description: Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Date | Name | Approved | Comments |
---|---|---|---|
08/14/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | Not Approved | |
08/14/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. | Not Approved | A. LOCATIONS. B. FORMWORK AND MEMBER SIZES. C. REINFORCING STEEL. D. ANCHORS: CAST-IN AND POST-INSTALLED. E. CONCRETE MIX AND PLACEMENT. F. PROTECTION AND CURING PROCEDURES. G. PRECAST CONCRETE. |
08/14/2024 | Final Foundation Design calculations and drawings are required prior to PRE-SLAB INSPECTION. | Not Approved | Plans indicate FOUNDATION DESIGN IS PRELIMINARY UNTIL FINAL EQUIPMENT LOADS ARE SUBMITTED AND APPROVED. |
08/14/2024 | SPECIAL INSPECTION FOR POST INSTALLED ANCHORS IS REQUIRED. | Not Approved | ANCHORS - POST-INSTALLED MECHANICAL AND ADHESIVE. |
08/14/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED. | Not Approved | A. EXCAVATION DEPTH. B. ADEQUACY OF EXPOSED SURFACE TO PROVIDE REQUIRED SUPPORT. C. PREPARATION OF SOILS/SURFACES SUPPORTING CONSTRUCTION. D. FILL AND BACKFILL. |
08/14/2024 | SPECIAL INSPECTION FOR STEEL CONSTRUCTION IS REQUIRED. | Not Approved | STRUCTURAL STEEL (CARBON AND STAINLESS). 1) HIGH-STRENGTH BOLTING. 2) WELDING. |
08/14/2024 | SPECIAL INSPECTION FOR STRUCTURAL ALUMINUM. IS REQUIRED. | Not Approved | 1) BOLTING. 2) WELDING |
08/14/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | Not Approved | A. LOCATIONS. B. MEMBER SIZES. C. REINFORCING STEEL. D. ANCHORS: BUILT-IN AND POST-INSTALLED. E. MORTAR AND JOINTS. F. GROUT AND GROUTING. G. PROTECTION AND CURING PROCEDURES. |
Plan Reviews
Plan Number - CIP-0524-00017
Plan Status: In Review
Plan Description: Addition of ion exchange contactors, automatic backwash filters, and a small electrical building at the existing TARP/AOP Water Treatment Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/17/2024 | CIP - Project Manager Review v.1 | APPROVED | |
06/24/2024 | CIP - Dev Site + Comm Structure - Initial v.1 | APPROVED | |
10/21/2024 | CIP - Dev Site + Comm Structure - Final v.2 | REQUIRES RESUBMIT | |
07/17/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
06/24/2024 | CIP - Project Manager Review v.1 | APPROVED | |
10/03/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
10/31/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
11/25/2024 | CIP - Dev Site + Comm Structure - Final v.2 | APPROVED |