Plan: CIP-0424-00013
Plan Details
Apply Date:
04/17/2024
Applicant:
Sarena
Description:
LRSC pre-fab metal bldg
Architects:
- ARC Studios Inc.
- DOWL
- EGSD AE CIP
- Lizard Rock Design
- Lizard Rock Designs LLC
- Lizard Rock Designs, LLC
- Sonoran Development Consulting
Contractors:
Outstanding Plan Activity Conditions
Plan Number - CIP-0424-00013
Plan Description: LRSC pre-fab metal bldg
Date | Name | Approved | Comments |
---|---|---|---|
08/05/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. (CAST-N-PLACE ANCHOR BOLTS) | Not Approved | Sheet S1.1 |
08/05/2024 | SPECIAL INSPECTION FOR FABRICATORS IS REQUIRED. | Not Approved | Sheet S1.1 |
08/05/2024 | SPECIAL INSPECTION FOR POST-INSTALLED ANCHORS IS REQUIRED. | Not Approved | Sheet S1.1 |
08/05/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED. | Not Approved | Sheet S1.1 |
Plan Reviews
Plan Number - CIP-0424-00013
Plan Status: In Review
Plan Description: LRSC pre-fab metal bldg
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/18/2024 | CIP - Dev Site + Comm Structure - Initial v.1 | APPROVED | |
04/17/2024 | CIP - Project Manager Review v.1 | APPROVED | |
09/20/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
07/17/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
07/17/2024 | CIP - Project Manager Review v.1 | APPROVED | |
10/10/2024 | CIP - Dev Site + Comm Structure - Final v.1 | APPROVED |