Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
TW New Area Development
Address:
1855 W PRINCE RD
Address NEW:
1855 W PRINCE RD
Apply Date:
06/01/2026
Applicant:
James Gomes
Description:
Shasta Apartments - Transferred to construction

Outstanding Activity Conditions

Permit Number - TW-DEVCON-0626-0043
Permit Status: Inspections
Permit Description: Shasta Apartments - Transferred to construction
Total Outstanding Activity Conditions - 1
Date Name
06/16/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TW-DEVCON-0626-0043
Permite Description: Shasta Apartments - Transferred to construction
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/20/2026 TWPE Pressure & Disinfection Testing N/A In Field Accepted
06/18/2026 TWPE Overnight Inspection N/A In Field Accepted
08/11/2026 Mock and Actual shutdowns N/A In Field Accepted TW valve crew did this on their work order
08/11/2026 Used to track and report construction water loss events not associated to Pressure or BacT testing. N/A In Field Accepted TW maint crew did discharge report
TWPE Daily Field Inspection N/A Scheduled
07/31/2026 TWPE Summary review of Daily Field Inspections N/A In Field Accepted

Scheduled Inspections

Scheduled Inspections - TW-DEVCON-0626-0043
Status: Inspections
Description: Shasta Apartments - Transferred to construction
Scheduled Date Description Entered By Entered Date
09/10/2026 TWPE Summary review of Daily Field Inspections Scheduled
09/04/2026 TWPE Daily Field Inspection Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .