Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
TW CIP Planning & Engineering
Apply Date:
05/12/2026
Applicant:
Scott Gallo
Description:
Rehabilitate Park Ave and Teton Rd roundabout.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TW-CONS-0526-0073
Permite Description: Rehabilitate Park Ave and Teton Rd roundabout.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
TWPE Summary review of Daily Field Inspections N/A Scheduled
07/30/2026 Used to track and report system pressure testing and associated water loss. N/A In Field Accepted 12” line Bac T sample was completed on 7/30/2026.
07/28/2026 Used to track and report chlorination BacT testing and associated water loss. N/A In Field Accepted Bac T sample was completed on 7/7/26. Sample passed.
09/11/2026 TWPE Daily Field Inspection N/A In Field Accepted Ashton called me to get clarification on the final grade of fire hydrant at station 38+59.04. They will be pouring concrete on Tuesday. I informed Ashton that they will have to raise the fire hydrant 6 inches to meet specs. Ashton will have Days excavating and install riser on fire hydrant.

Scheduled Inspections

Scheduled Inspections - TW-CONS-0526-0073
Status: Inspections
Description: Rehabilitate Park Ave and Teton Rd roundabout.
Scheduled Date Description Entered By Entered Date
09/21/2026 TWPE Daily Field Inspection Scheduled
09/21/2026 TWPE Summary review of Daily Field Inspections Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .