Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
TW CIP Planning & Engineering
Address:
9900 E DREXEL RD
Address NEW:
9900 E DREXEL RD
Apply Date:
03/28/2026
Applicant:
Al heimpel
Description:
Construction of the 4th basin at SHARP.

Outstanding Inspections

Permit Status: Complete
Permit Number: TW-CONS-0326-0012
Permite Description: Construction of the 4th basin at SHARP.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
TWPE Summary review of Daily Field Inspections N/A Scheduled
TWPE Daily Field Inspection N/A Scheduled
10/21/2026 TWPE Electrical Final N/A Deferred
07/23/2026 TWPE Substantial Completion N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TW-CONS-0326-0012
Permit Description: Construction of the 4th basin at SHARP.
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/18/2026 TWPE Site Commissioning Passed
10/07/2026 TWPE Engineering Final Passed
10/21/2026 Passed
10/21/2026 TWPE Field Final Passed

Scheduled Inspections

Scheduled Inspections - TW-CONS-0326-0012
Status: Complete
Description: Construction of the 4th basin at SHARP.
Scheduled Date Description Entered By Entered Date
11/05/2026 TWPE Summary review of Daily Field Inspections Scheduled
11/05/2026 TWPE Daily Field Inspection Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .