Permit: TS-PRM-1222-00070
Permit Details
Apply Date:
12/13/2022
Applicant:
Andrew Chi
Description:
Manufacture and install two (2) permanent signs (Sign A & Sign B) for a new Marijuana Dispensary. Sign A is a 4.16' x 12.5' = 52.08 square foot internally lit custom cabinet building sign mounted on the south elevation of the building; and Sign B is a 4.5' x 4.0' = 18.0 square foot internally lit detached custom cabinet sign mounted on a decorative freestanding pole with a total height of 10.0 feet and located at the southeastern corner of the parcel.
Permit Reviews
Permit Number - TS-PRM-1222-00070
Permit Status: Complete
Permit Description: Manufacture and install two (2) permanent signs (Sign A & Sign B) for a new Marijuana Dispensary. Sign A is a 4.16' x 12.5' = 52.08 square foot internally lit custom cabinet building sign mounted on the south elevation of the building; and Sign B is a 4.5' x 4.0' = 18.0 square foot internally lit detached custom cabinet sign mounted on a decorative freestanding pole with a total height of 10.0 feet and located at the southeastern corner of the parcel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/14/2022 | PERMANENT SIGN REVIEW v.1 | 12/15/2022 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TS-PRM-1222-00070
Permit Description: Manufacture and install two (2) permanent signs (Sign A & Sign B) for a new Marijuana Dispensary. Sign A is a 4.16' x 12.5' = 52.08 square foot internally lit custom cabinet building sign mounted on the south elevation of the building; and Sign B is a 4.5' x 4.0' = 18.0 square foot internally lit detached custom cabinet sign mounted on a decorative freestanding pole with a total height of 10.0 feet and located at the southeastern corner of the parcel.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2023 | COT - ENGR - Sign Height | Passed | ||
| 02/03/2023 | COT - ENGR - Sign Setback and Height | Passed | Provide a photo showing the depth of the foundation prior to acceptance for Monday’s pour | |
| 12/12/2023 | COT - ENGR - Sign Electrical | Passed | ||
| 12/12/2023 | COT - SIGN - Sign Final | Passed |