Permit: TS-PRM-0825-00328
Permit Details
Status:
Inspections
Type:
Sign - Permanent
Address:
4697 S CAMPBELL AV
Address NEW:
4697 S CAMPBELL AV
Apply Date:
08/01/2025
Applicant:
Wendy Martin
Description:
(1) New monument sign, (4) new wall signs, and (2) new directional signs
Permit Reviews
Permit Number - TS-PRM-0825-00328
Permit Status: Inspections
Permit Description: (1) New monument sign, (4) new wall signs, and (2) new directional signs
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2026 | PERMANENT SIGN REVIEW v.3 | 02/26/2026 | APPROVED |
| 08/04/2025 | PERMANENT SIGN REVIEW v.1 | 08/28/2025 | REQUIRES RESUBMIT |
| 02/26/2026 | RESTAMP - PERMANENT SIGN v.1 | 03/02/2026 | APPROVED |
| 01/23/2026 | PERMANENT SIGN REVIEW v.2 | 02/12/2026 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TS-PRM-0825-00328
Permite Description: (1) New monument sign, (4) new wall signs, and (2) new directional signs
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - ENGR - Sign Electrical | N/A | Not Ready | Monument has power disconnect on sign Wall sign disconnect switches are located behind wall at power supply. Circuits are labeled correctly. -No timer. Shut off and on times are controlled by off site 3rd party. Permit states timer shall shut off all signs at midnight. I need documentation showing that sign are complying with Tucson Outdoor lighting code. Reschedule inspection when this can be provided. |
| 07/22/2026 | COT - ENGR - Signage Final | N/A | Not Ready | Permitted signs are in place correct to plan. UL and Manufacturer stickers are in place on signs Permit states timer shall shut off all signs at midnight. I need documentation showing that signs are complying with Tucson Outdoor lighting code. Reschedule inspection when this can be provided. |
Completed Inspections
Permit Status: Inspections
Permit Number: TS-PRM-0825-00328
Permit Description: (1) New monument sign, (4) new wall signs, and (2) new directional signs
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | COT - ENGR - Sign Drilled-Pier | Passed | Footing excavation for Sign 'A': location and dimensions are accurate to plans, okay to pour post. | |
| 06/25/2026 | COT - ENGR - Sign Footing and Excavation | Passed | Footing excavation for Sign 'A': location and dimensions are accurate to plans, okay to pour post. |