Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Sign - Permanent
Address NEW:
7150 E SPEEDWAY BL
Apply Date:
06/26/2024
Applicant:
Shirley Lam
Description:
Installation of manufacturing illuminated and non-illuminated wall signs along with 2 monuments and Digital price boards

Permit Reviews

Permit Number - TS-PRM-0624-00293
Permit Status: Inspections
Permit Description: Installation of manufacturing illuminated and non-illuminated wall signs along with 2 monuments and Digital price boards
Start Date Submittal Complete Date Status  
06/26/2024 PERMANENT SIGN REVIEW v.1 07/24/2024 REQUIRES RESUBMIT Review Details
09/30/2024 PERMANENT SIGN REVIEW v.2 10/02/2024 REQUIRES RESUBMIT Review Details
10/24/2024 PERMANENT SIGN REVIEW v.5 11/18/2024 REQUIRES RESUBMIT Review Details
10/08/2024 PERMANENT SIGN REVIEW v.4 10/21/2024 REQUIRES RESUBMIT Review Details
11/18/2024 PERMANENT SIGN REVIEW v.6 11/26/2024 APPROVED Review Details
10/07/2024 PERMANENT SIGN REVIEW v.3 10/07/2024 REQUIRES RESUBMIT Review Details
05/23/2025 PERMANENT SIGN REVIEW REVISION v.1 05/27/2025 APPROVED Review Details
05/21/2025 PERMANENT SIGN REVIEW v.1 05/22/2025 REQUIRES RESUBMIT Review Details
05/22/2025 PERMANENT SIGN REVIEW REVISION v.1 05/22/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TS-PRM-0624-00293
Permite Description: Installation of manufacturing illuminated and non-illuminated wall signs along with 2 monuments and Digital price boards
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/28/2025 COT - ENGR - Sign Footing and Excavation N/A Partial Pass Contractor and pour the footer for the post

Completed Inspections

Permit Status: Inspections
Permit Number: TS-PRM-0624-00293
Permit Description: Installation of manufacturing illuminated and non-illuminated wall signs along with 2 monuments and Digital price boards
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/02/2025 COT - SIGN - Sign Final Passed 07/02/25, observed, disconnect switches, installer labels, UL labels, breakers and timers.
Equipment for the Kolb Rd sign is in back of the main store. Equipment for the Speedway sign is in the rear of the gas station.

All signs permitted have been installed.
07/02/2025 COT - ENGR - Sign Setback and Height Passed Meets and or exceeds required set back and height
07/02/2025 COT - SIGN - Sign Electrical Passed 07/02/25, observed, disconnect switches, installer labels, UL labels, breakers and timers.
Equipment for the Kolb Rd sign is in back of the main store. Equipment for the Speedway sign is in the rear of the gas station.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3RD REVISED PLANS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW