Permit: TS-PRM-0223-00191
Permit Details
Apply Date:
02/16/2023
Applicant:
Mark Jones
Description:
Manufacture and install a new internally illuminated 6.0 feet tall, 18.75 SF freestanding monument sign located along E. Speedway Blvd. for a newly-constructed Taco Bell restaurant at the SWC of Speedway Blvd & N Campbell Ave.
Permit Reviews
Permit Number - TS-PRM-0223-00191
Permit Status: Complete
Permit Description: Manufacture and install a new internally illuminated 6.0 feet tall, 18.75 SF freestanding monument sign located along E. Speedway Blvd. for a newly-constructed Taco Bell restaurant at the SWC of Speedway Blvd & N Campbell Ave.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2023 | PERMANENT SIGN REVIEW v.1 | 03/07/2023 | REQUIRES RESUBMIT |
04/04/2023 | PERMANENT SIGN REVIEW v.2 | 04/18/2023 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TS-PRM-0223-00191
Permit Description: Manufacture and install a new internally illuminated 6.0 feet tall, 18.75 SF freestanding monument sign located along E. Speedway Blvd. for a newly-constructed Taco Bell restaurant at the SWC of Speedway Blvd & N Campbell Ave.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2023 | COT - ENGR - Sign Footing and Excavation | Passed | ||
08/24/2023 | COT - ENGR - Sign Electrical | Passed | ||
08/24/2023 | COT - ENGR - Sign Setback and Height | Passed |