Permit Details

Status:
Inspections
Type:
Sign - Permanent
Apply Date:
01/20/2026
Applicant:
Aaron Garcia
Description:
Install (4) sets of illuminated channel letters

Permit Reviews

Permit Number - TS-PRM-0126-00019
Permit Status: Inspections
Permit Description: Install (4) sets of illuminated channel letters
Start Date Submittal Complete Date Status  
06/12/2026 PERMANENT SIGN REVIEW v.5 06/24/2026 APPROVED Review Details
04/09/2026 PERMANENT SIGN REVIEW v.3 04/21/2026 REQUIRES RESUBMIT Review Details
01/23/2026 PERMANENT SIGN REVIEW v.2 02/10/2026 REQUIRES RESUBMIT Review Details
01/21/2026 PERMANENT SIGN REVIEW v.1 01/21/2026 REQUIRES RESUBMIT Review Details
06/01/2026 PERMANENT SIGN REVIEW v.4 06/09/2026 REQUIRES RESUBMIT Review Details
06/24/2026 RESTAMP - PERMANENT SIGN v.1 06/25/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TS-PRM-0126-00019
Permit Status: Inspections
Permit Description: Install (4) sets of illuminated channel letters
Total Outstanding Activity Conditions - 1
Date Name
04/14/2026 Sign anchors for signs over 30ft above grade to include all types (concrete anchors, epoxy, thru-bolts etc) will require a special inspection

Conditions

Permit Number - TS-PRM-0126-00019
Permit Status: Inspections
Permit Description: Install (4) sets of illuminated channel letters
Date Description Comments
06/23/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/14/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TS-PRM-0126-00019
Permite Description: Install (4) sets of illuminated channel letters
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/03/2026 COT - ENGR - Sign Electrical N/A Not Ready Contractor will email pictures of labeled safety lockouts on 2 disconnect switches in space above 4th floor drop ceiling. Or build disconnects per permit. Signs on timer set for 24 hour business operation.
08/03/2026 COT - ENGR - Signage Final N/A Not Ready Currently not all stickers on signs as required per permit…. Pictures will be emailed of manufacturer, installer, and UL listing stickers on exterior of signs.