Permit: TR-UTL-1225-02212
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5860 E 29TH ST
Address NEW:
5860 E 29TH ST
Apply Date:
12/30/2025
Applicant:
ANGEL MORALES
Description:
P.092660 KAHNA TRENCH 38' TO PLACE CONDUIT AND FIBER CABLE, PLACE 4496' OF AERIAL FIBER CABLE, PLACE 1 HH
Permit Reviews
Permit Number - TR-UTL-1225-02212
Permit Status: Complete
Permit Description: P.092660 KAHNA
TRENCH 38' TO PLACE CONDUIT AND FIBER CABLE, PLACE 4496' OF AERIAL FIBER CABLE, PLACE 1 HH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02212
Permit Status: Complete
Permit Description: P.092660 KAHNA
TRENCH 38' TO PLACE CONDUIT AND FIBER CABLE, PLACE 4496' OF AERIAL FIBER CABLE, PLACE 1 HH
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/05/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/05/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |
| 12/31/2025 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 12/31/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/31/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02212
Permit Description: P.092660 KAHNA
TRENCH 38' TO PLACE CONDUIT AND FIBER CABLE, PLACE 4496' OF AERIAL FIBER CABLE, PLACE 1 HH
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Rob with Pauley Construction over the phone. Several jobs are being performed within the area. Precon is passed and work can begin at contractors discretion. | |
| 04/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Job completed, traffic control devices removed from site | |
| 04/20/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | all over lash completed, heights and strands approved | |
| 04/20/2026 | TRSP - ROW - Final | Passed | over lash, riser, and backfill completed, traffic control barricades removed from site, job complete |