Permit: TR-UTL-1225-02183
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1390 E PEWIT DR
Address NEW:
1390 E PEWIT DR
Apply Date:
12/22/2025
Applicant:
Adrien Pineda
Description:
*90 DAY PERMIT* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 15X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1390 E PEWIT DR Work Completed Per Applicant, updating per Applicant information provided
Permit Reviews
Permit Number - TR-UTL-1225-02183
Permit Status: Inspections
Permit Description: *90 DAY PERMIT* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 15X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1390 E PEWIT DR
Work Completed Per Applicant, updating per Applicant information provided
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02183
Permit Status: Inspections
Permit Description: *90 DAY PERMIT* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 15X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1390 E PEWIT DR
Work Completed Per Applicant, updating per Applicant information provided
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/23/2025 | PRE-CON\SIDEWALK |
| 12/23/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1225-02183
Permite Description: *90 DAY PERMIT* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 15X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1390 E PEWIT DR
Work Completed Per Applicant, updating per Applicant information provided
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2026 | TRSP - ROW - Final | N/A | Re-inspection required |