Permit: TR-UTL-1225-02170
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3205 N CAMPBELL AV
Address NEW:
3205 N CAMPBELL AV
Apply Date:
12/18/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 1-8" Fire Hydrant, 2-1" water services with Meter & Box, and 1-2" water service with Meter & Box
Permit Reviews
Permit Number - TR-UTL-1225-02170
Permit Status: Inspections
Permit Description: Installing 1-8" Fire Hydrant, 2-1" water services with Meter & Box, and 1-2" water service with Meter & Box
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/22/2025 | REQUIRES RESUBMIT |
| 01/12/2026 | RIGHT-OF-WAY REVIEW v.2 | 01/12/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02170
Permit Status: Inspections
Permit Description: Installing 1-8" Fire Hydrant, 2-1" water services with Meter & Box, and 1-2" water service with Meter & Box
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 01/12/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 01/12/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 01/12/2026 | Message Boards to be placed 5 day in advance of work |
| 01/12/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 01/12/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL |
| 01/12/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/12/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 12/19/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1225-02170
Permit Description: Installing 1-8" Fire Hydrant, 2-1" water services with Meter & Box, and 1-2" water service with Meter & Box
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/19/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/29/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |