Permit: TR-UTL-1225-02164
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3857 E GLENN ST
Address NEW:
3857 E GLENN ST
Apply Date:
12/17/2025
Applicant:
Irvin Beltran
Description:
Excavating a 3x2 trench at 3857 e glenn st in sidewalk in cement and dirt to replace gas service.
Permit Reviews
Permit Number - TR-UTL-1225-02164
Permit Status: Complete
Permit Description: Excavating a 3x2 trench at 3857 e glenn st in sidewalk in cement and dirt to replace gas service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/24/2025 | REQUIRES RESUBMIT |
| 01/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 01/22/2026 | APPROVED |
| 12/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/18/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02164
Permit Status: Complete
Permit Description: Excavating a 3x2 trench at 3857 e glenn st in sidewalk in cement and dirt to replace gas service.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 01/07/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. jose.garcia@tucsonaz.gov |
| 01/07/2026 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 01/07/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 01/07/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/07/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/07/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 12/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02164
Permit Description: Excavating a 3x2 trench at 3857 e glenn st in sidewalk in cement and dirt to replace gas service.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/26/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/26/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/26/2026 | TRSP - ROW - Final | Passed |