Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8523 E SHASTA DR
Address NEW:
8523 E SHASTA DR
Apply Date:
12/12/2025
Applicant:
Tucson Electric Power
Description:
WO T112180. CHANGING OUT 6 POLES & 2 GUY WIRES. 03/24/26- Renew permit for 90 days as of 04/02/26 new expiration date is 07/01/2026.

Permit Reviews

Permit Number - TR-UTL-1225-02152
Permit Status: Complete
Permit Description: WO T112180. CHANGING OUT 6 POLES & 2 GUY WIRES. 03/24/26- Renew permit for 90 days as of 04/02/26 new expiration date is 07/01/2026.
Start Date Submittal Complete Date Status  
12/12/2025 RIGHT-OF-WAY REVIEW v.1 12/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1225-02152
Permit Status: Complete
Permit Description: WO T112180. CHANGING OUT 6 POLES & 2 GUY WIRES. 03/24/26- Renew permit for 90 days as of 04/02/26 new expiration date is 07/01/2026.
Total Outstanding Activity Conditions - 2
Date Name
12/15/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section
12/15/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1225-02152
Permit Description: WO T112180. CHANGING OUT 6 POLES & 2 GUY WIRES. 03/24/26- Renew permit for 90 days as of 04/02/26 new expiration date is 07/01/2026.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/05/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Site is ready for work to begin
04/02/2026 TRSP - ROW - Barricade - Setup/Routine Passed Signs and barricades are in place per TCP
04/02/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
06/29/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
AERIAL MAP T112180_V1.PDF DOCUMENTS VIEW