Permit: TR-UTL-1225-02150
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2201 E PINE ST
Address NEW:
2201 E PINE ST
Apply Date:
12/12/2025
Applicant:
Richard Sanders
Description:
wo # 3146030, 2201 e pine st 14-15-05 nw, install new fire hydrant on the west side on n balsam cir, 6lf. ca
Permit Reviews
Permit Number - TR-UTL-1225-02150
Permit Status: Complete
Permit Description: wo # 3146030, 2201 e pine st 14-15-05 nw, install new fire hydrant on the west side on n balsam cir, 6lf. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02150
Permit Status: Complete
Permit Description: wo # 3146030, 2201 e pine st 14-15-05 nw, install new fire hydrant on the west side on n balsam cir, 6lf. ca
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/16/2025 | A STREET UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 12/16/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02150
Permite Description: wo # 3146030, 2201 e pine st 14-15-05 nw, install new fire hydrant on the west side on n balsam cir, 6lf. ca
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 02/09/2026 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02150
Permit Description: wo # 3146030, 2201 e pine st 14-15-05 nw, install new fire hydrant on the west side on n balsam cir, 6lf. ca
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/20/2026 | TRSP - ROW - Final | Passed |