Permit: TR-UTL-1225-02133
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
4701 N STONE AV
Address NEW:
4701 N STONE AV
Apply Date:
12/11/2025
Applicant:
John Rhodes
Description:
Tie in pointTie in point from Alternative splice case SP0049 That is currently being built.. From existing dog house south on Stone Ave crossing under River Rd. Then turn west under Stone Ave then south again. Install 5 vaults. Total bore 1860'
Permit Reviews
Permit Number - TR-UTL-1225-02133
Permit Status: Needs resubmittal
Permit Description: Tie in pointTie in point from Alternative splice case SP0049 That is currently being built.. From existing dog house south on Stone Ave crossing under River Rd. Then turn west under Stone Ave then south again. Install 5 vaults. Total bore 1860'
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/15/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02133
Permit Status: Needs resubmittal
Permit Description: Tie in pointTie in point from Alternative splice case SP0049 That is currently being built.. From existing dog house south on Stone Ave crossing under River Rd. Then turn west under Stone Ave then south again. Install 5 vaults. Total bore 1860'
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/15/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 12/15/2025 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination |
| 12/15/2025 | Traffic control set-up approved between 9AM - 3:30PM |