Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2402 S PLUMER AV
Address NEW:
2402 S PLUMER AV
Apply Date:
12/09/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE ARIZONA PIPELINE WILL NEED APPROX. 90 DAYS IN ORDER TO RAPLACE GAS SERVCEI

Permit Reviews

Permit Number - TR-UTL-1225-02113
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE ARIZONA PIPELINE WILL NEED APPROX. 90 DAYS IN ORDER TO RAPLACE GAS SERVCEI
Start Date Submittal Complete Date Status  
12/10/2025 RIGHT-OF-WAY REVIEW v.1 12/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1225-02113
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE ARIZONA PIPELINE WILL NEED APPROX. 90 DAYS IN ORDER TO RAPLACE GAS SERVCEI
Total Outstanding Activity Conditions - 2
Date Name
12/10/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
12/10/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1225-02113
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE ARIZONA PIPELINE WILL NEED APPROX. 90 DAYS IN ORDER TO RAPLACE GAS SERVCEI
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/12/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
2402 S PLUMER AVE AIREAL_V1.PDF DOCUMENTS VIEW
2402 S PLUMER AVE SITE_V1.PDF DOCUMENTS VIEW
2402 W PLUMER AVE_V1.PDF DOCUMENTS VIEW