Permit: TR-UTL-1225-02103
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2101 N STONE AV
Address NEW:
2101 N STONE AV
Apply Date:
12/08/2025
Applicant:
Cox Communications
Description:
Barricade only: Cox to Attach 781' of 48ct Fiber to TEP Poles for system tie
Permit Reviews
Permit Number - TR-UTL-1225-02103
Permit Status: Complete
Permit Description: Barricade only: Cox to Attach 781' of 48ct Fiber to TEP Poles for system tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02103
Permit Status: Complete
Permit Description: Barricade only: Cox to Attach 781' of 48ct Fiber to TEP Poles for system tie
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/09/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 12/10/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 12/10/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02103
Permit Description: Barricade only: Cox to Attach 781' of 48ct Fiber to TEP Poles for system tie
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/03/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/10/2026 | TRSP - ROW - Final | Passed |