Permit: TR-UTL-1225-02051
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4802 E 12TH ST
Address NEW:
4802 E 12TH ST
Apply Date:
12/03/2025
Applicant:
Austin Eslick
Description:
T147192 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (7) pole locations. Risers to be replaced at (1) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
Permit Reviews
Permit Number - TR-UTL-1225-02051
Permit Status: Complete
Permit Description: T147192 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (7) pole locations. Risers to be replaced at (1) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/08/2025 | REQUIRES RESUBMIT |
| 12/11/2025 | RIGHT-OF-WAY REVIEW v.2 | 12/18/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02051
Permit Status: Complete
Permit Description: T147192 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (7) pole locations. Risers to be replaced at (1) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 12/04/2025 | ALLEY |
| 12/04/2025 | PRE-CON/SIDEWALK |
| 12/04/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/08/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1225-02051
Permit Description: T147192 - Crews to park in the City of Tucson ROW to replace (13) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (7) pole locations. Risers to be replaced at (1) pole locations. No sidewalk impact. 2’x2’ excavations per pole.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Had an on-site meeting with Gerardo Villalobos and the proposed work, he told me that work would begin sometime next week. We discussed adding “alley closed” signs to further deter the public from entering the work zone. | |
| 03/31/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is now complete and traffic control has been removed but during work the traffic control was set up according to the approved TCP | |
| 03/31/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 03/31/2026 | TRSP - ROW - Final | Passed | Work is complete. |