Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1225-02039
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
9484 E 22ND ST
Address NEW:
9484 E 22ND ST
Apply Date:
12/02/2025
Applicant:
Judy Boyer
Description:
Will be working at the intersection of S Harrison Rd and E 22nd St. 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Permit Reviews
Permit Number - TR-UTL-1225-02039
Permit Status: Inspections
Permit Description: Will be working at the intersection of S Harrison Rd and E 22nd St. 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02039
Permit Status: Inspections
Permit Description: Will be working at the intersection of S Harrison Rd and E 22nd St. 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 12/02/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 12/02/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/02/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 12/02/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
| 12/03/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 12/03/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 12/03/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 12/03/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1225-02039
Permit Description: Will be working at the intersection of S Harrison Rd and E 22nd St. 2 5x5 bell holes in blktop/dirt for crews to pothole gas line
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Site is ready for work to begin. |