Permit: TR-UTL-1224-02433
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4160 N 1ST AV
Address NEW:
4160 N 1ST AV
Apply Date:
12/30/2024
Applicant:
Cox Communications
Description:
PRJ284842-4- Cox to tie in & overlash 137ft of (1) .625 Power feed coax & tie in.
Permit Reviews
Permit Number - TR-UTL-1224-02433
Permit Status: Complete
Permit Description: PRJ284842-4- Cox to tie in & overlash 137ft of (1) .625 Power feed coax & tie in.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/30/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/02/2025 | REQUIRES RESUBMIT |
| 01/03/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/07/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02433
Permit Status: Complete
Permit Description: PRJ284842-4- Cox to tie in & overlash 137ft of (1) .625 Power feed coax & tie in.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/06/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 01/06/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 12/31/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/31/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02433
Permit Description: PRJ284842-4- Cox to tie in & overlash 137ft of (1) .625 Power feed coax & tie in.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/20/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 02/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/27/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/05/2025 | TRSP - ROW - Final | Passed |