Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1224-02428
Permit Details
Apply Date:
12/26/2024
Applicant:
Quail Traffic
Description:
EXCAVATING A 52X4 TRENCH AT *234 E 6TH ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 52' EAST OF EAST P/L AND 72' SOUTH OF NORTH P/L
Permit Reviews
Permit Number - TR-UTL-1224-02428
Permit Status: Inspections
Permit Description: EXCAVATING A 52X4 TRENCH AT *234 E 6TH ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 52' EAST OF EAST P/L AND 72' SOUTH OF NORTH P/L
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02428
Permit Status: Inspections
Permit Description: EXCAVATING A 52X4 TRENCH AT *234 E 6TH ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 52' EAST OF EAST P/L AND 72' SOUTH OF NORTH P/L
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
12/27/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
12/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1224-02428
Permit Description: EXCAVATING A 52X4 TRENCH AT *234 E 6TH ST TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 52' EAST OF EAST P/L AND 72' SOUTH OF NORTH P/L
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
01/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
01/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |