Permit: TR-UTL-1224-02427
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2341 S FRIEBUS AV
Address NEW:
2341 S FRIEBUS AV
Apply Date:
12/26/2024
Applicant:
Cox Communications
Description:
Cox to pull 773' of fiber through existing conduit and place peds for system tie.
Permit Reviews
Permit Number - TR-UTL-1224-02427
Permit Status: Complete
Permit Description: Cox to pull 773' of fiber through existing conduit and place peds for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02427
Permit Status: Complete
Permit Description: Cox to pull 773' of fiber through existing conduit and place peds for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 12/30/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 12/30/2024 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 12/30/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 12/30/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02427
Permit Description: Cox to pull 773' of fiber through existing conduit and place peds for system tie.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Kory | |
| 02/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | All work has been completed no barricade set up or take down inspections required | |
| 02/05/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | All work was performed underground. No aerial installations were made. 3 new pedestals were installed | |
| 02/20/2025 | TRSP - ROW - Barricade Takedown | Passed | Traffic control devices removed, job completed | |
| 02/26/2025 | TRSP - ROW - Final | Passed | all prior inspections passed, traffic control devices removed, job completed |