Permit: TR-UTL-1224-02410
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7821 E LONGLEAF PL
Address NEW:
7821 E LONGLEAF PL
Apply Date:
12/23/2024
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT: WO T133741. TEP REPLACED PEDESTAL AS A PRIORITY.
Permit Reviews
Permit Number - TR-UTL-1224-02410
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T133741. TEP REPLACED PEDESTAL AS A PRIORITY.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02410
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T133741. TEP REPLACED PEDESTAL AS A PRIORITY.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 12/24/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 12/24/2024 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to TEP to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 12/24/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 12/24/2024 | NOTE: WORK IS BEHIND 7821 E LONGLEAF PL - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02410
Permit Description: AFTER-THE-FACT: WO T133741. TEP REPLACED PEDESTAL AS A PRIORITY.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | TRSP - ROW - Final | Passed | New pedestal installed, fully backfilled with native soil in alleyway landscape area, job complete |