Permit: TR-UTL-1224-02380
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1002 S BRIGHTON AV
Address NEW:
1002 S BRIGHTON AV
Apply Date:
12/18/2024
Applicant:
luis granillo
Description:
wo2940622 1002 s brighton ave 14-14-13 sw leaking main behind property in dirt alley 10lf/ar
Permit Reviews
Permit Number - TR-UTL-1224-02380
Permit Status: Complete
Permit Description: wo2940622 1002 s brighton ave 14-14-13 sw leaking main behind property in dirt alley 10lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02380
Permit Status: Complete
Permit Description: wo2940622 1002 s brighton ave 14-14-13 sw leaking main behind property in dirt alley 10lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/19/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 12/19/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02380
Permit Description: wo2940622 1002 s brighton ave 14-14-13 sw leaking main behind property in dirt alley 10lf/ar
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/16/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 01/16/2025 | TRSP - ROW - Final | Passed |