Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2799 E GLENN ST
Address NEW:
2799 E GLENN ST
Apply Date:
12/12/2024
Applicant:
Desert Barricades LLC
Description:
WO T130325 - TEP will be working in ROW to install conductor into customer provided duct system, completed secondary pedestal and set new meter.

Permit Reviews

Permit Number - TR-UTL-1224-02343
Permit Status: Complete
Permit Description: WO T130325 - TEP will be working in ROW to install conductor into customer provided duct system, completed secondary pedestal and set new meter.
Start Date Submittal Complete Date Status  
12/16/2024 RIGHT-OF-WAY REVIEW v.2 12/17/2024 APPROVED Review Details
12/12/2024 RIGHT-OF-WAY REVIEW v.1 12/16/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1224-02343
Permit Status: Complete
Permit Description: WO T130325 - TEP will be working in ROW to install conductor into customer provided duct system, completed secondary pedestal and set new meter.
Total Outstanding Activity Conditions - 3
Date Name
12/13/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
12/13/2024 Traffic control set-up approved between 9AM - 3:30PM
12/16/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1224-02343
Permit Description: WO T130325 - TEP will be working in ROW to install conductor into customer provided duct system, completed secondary pedestal and set new meter.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/20/2025 TRSP - ROW - Barricade - Setup/Routine Passed
02/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/20/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
02/20/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DB 70316 - 2799 E GLENN ST - BUMPOUTS - T130325 REVISED_V2.PDF DOCUMENTS VIEW
T130325 PERMIT MAP_V1.PDF DOCUMENTS VIEW