Permit: TR-UTL-1224-02332
Permit Details
Apply Date:
12/10/2024
Applicant:
Cox Communications
Description:
Cox-PRJ283474-1-Cox to remove & replace 1 pedestal location, will place 1 new vault location, to include total of 4ft of trench, Will also bore total 1234ft, (2) 2" conduits, and pull (1) 288ct fiber thru same.
Permit Reviews
Permit Number - TR-UTL-1224-02332
Permit Status: Complete
Permit Description: Cox-PRJ283474-1-Cox to remove & replace 1 pedestal location, will place 1 new vault location, to include total of 4ft of trench, Will also bore total 1234ft, (2) 2" conduits, and pull (1) 288ct fiber thru same.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/23/2024 | RIGHT-OF-WAY REVIEW v.2 | 12/24/2024 | APPROVED |
12/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/13/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02332
Permit Status: Complete
Permit Description: Cox-PRJ283474-1-Cox to remove & replace 1 pedestal location, will place 1 new vault location, to include total of 4ft of trench, Will also bore total 1234ft, (2) 2" conduits, and pull (1) 288ct fiber thru same.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
12/12/2024 | Traffic control set-up approved between 9AM - 3:30PM |
12/12/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
12/12/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02332
Permit Description: Cox-PRJ283474-1-Cox to remove & replace 1 pedestal location, will place 1 new vault location, to include total of 4ft of trench, Will also bore total 1234ft, (2) 2" conduits, and pull (1) 288ct fiber thru same.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | spoke with kevin on the phone and completed the pre con over the phone. work may not start for another week. | |
02/05/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
02/05/2025 | TRSP - ROW - Final | Passed | Spoke with both Kevin and Francisco, and both confirmed that this job has already been completed, and that one pedestal was replaced. An existing conduit was used therefore no boring and no damage to sidewalks or paved areas in the right away. | |
02/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Spoke with Francisco over the phone. He stated that the job has already been completed that they replaced a pedestal and use existing conduit, and there was no impact to the right away. | |
02/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Spoke to Francisco over the phone, and he stated that the job was done that they replaced a pedestal and used existing conduit, and therefore no impact to the right away |