Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1224-02323
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5145 E 5TH ST
Address NEW:
5145 E 5TH ST
Apply Date:
12/09/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN DIRT AND ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-1224-02323
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN DIRT AND ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02323
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN DIRT AND ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 12/10/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 12/10/2024 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. |
| 12/10/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02323
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN DIRT AND ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/19/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 01/09/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/28/2025 | TRSP - ROW - Final | Passed |