Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1224-02310
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
250 S WILLIAMS BL
Address NEW:
250 S WILLIAMS BL
Apply Date:
12/06/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-1224-02310
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02310
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/06/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 12/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02310
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE A 50'X2' TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/13/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 01/13/2025 | TRSP - ROW - Final | Passed |