Permit: TR-UTL-1224-02291
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
634 S MARVIN AV
Address NEW:
634 S MARVIN AV
Apply Date:
12/04/2024
Applicant:
Chelsey Bolinger
Description:
** CONTINUATION OF TR-UTL-0524-01046** P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-1224-02291
Permit Status: Complete
Permit Description: ** CONTINUATION OF TR-UTL-0524-01046** P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/04/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02291
Permit Status: Complete
Permit Description: ** CONTINUATION OF TR-UTL-0524-01046** P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 12/06/2024 | ALLEY |
| 12/06/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 12/06/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 12/06/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02291
Permit Description: ** CONTINUATION OF TR-UTL-0524-01046** P.067189A (KAHNA) - TRENCH 17' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLES. OVERLASH 3930' OF AERIAL FIBER CABLE.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/18/2025 | TRSP - ROW - Final | Passed |