Permit: TR-UTL-1224-02271
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3803 N COUNTRY CLUB RD
Address NEW:
3803 N COUNTRY CLUB RD
Apply Date:
12/04/2024
Applicant:
Chelsey Bolinger
Description:
Job previously approved under the original design TR-UTL-0524-00999. P.099096A (KAHNA) - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1621' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-1224-02271
Permit Status: Complete
Permit Description: Job previously approved under the original design TR-UTL-0524-00999. P.099096A (KAHNA) - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1621' OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/04/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02271
Permit Status: Complete
Permit Description: Job previously approved under the original design TR-UTL-0524-00999. P.099096A (KAHNA) - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1621' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/05/2024 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 12/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02271
Permit Description: Job previously approved under the original design TR-UTL-0524-00999. P.099096A (KAHNA) - BORE 2914' & TRENCH 535' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (38) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1621' OF AERIAL FIBER CABLE.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/18/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/18/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 03/18/2025 | TRSP - ROW - Final | Passed |