Permit: TR-UTL-1224-02270
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5701 E CALLE SILVOSA
Address NEW:
5701 E CALLE SILVOSA
Apply Date:
12/04/2024
Applicant:
Description:
wo2932931 5701 e calle silvosa 14-14-24 sw leaking main in dirt alley 8lf/ar
Permit Reviews
Permit Number - TR-UTL-1224-02270
Permit Status: Complete
Permit Description: wo2932931 5701 e calle silvosa 14-14-24 sw leaking main in dirt alley 8lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/04/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02270
Permit Status: Complete
Permit Description: wo2932931 5701 e calle silvosa 14-14-24 sw leaking main in dirt alley 8lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/05/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 12/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02270
Permite Description: wo2932931 5701 e calle silvosa 14-14-24 sw leaking main in dirt alley 8lf/ar
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2025 | TRSP - ROW - Final | N/A | Not Ready | Awaiting previous inspections to pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1224-02270
Permit Description: wo2932931 5701 e calle silvosa 14-14-24 sw leaking main in dirt alley 8lf/ar
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all traffic control devices removed, job complete | |
| 04/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre-con meeting held, job complete | |
| 04/20/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | alleyway dirt restored, job complete | |
| 04/20/2026 | TRSP - ROW - Final | Passed | alleyway landscape restored, traffic control devices removed, job complete |