Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2661 E SIMMONS ST
Apply Date:
12/04/2024
Applicant:
Chelsey Bolinger
Description:
Job previously approved under the original design TR-UTL-0524-00988. P.099097D (KAHNA) - BORE 3023' & TRENCH 182' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (25) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1462' OF AERIAL FIBER CABLE.

Permit Reviews

Permit Number - TR-UTL-1224-02268
Permit Status: Complete
Permit Description: Job previously approved under the original design TR-UTL-0524-00988. P.099097D (KAHNA) - BORE 3023' & TRENCH 182' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (25) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1462' OF AERIAL FIBER CABLE.
Start Date Submittal Complete Date Status  
12/04/2024 RIGHT-OF-WAY REVIEW v.1 12/06/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1224-02268
Permit Status: Complete
Permit Description: Job previously approved under the original design TR-UTL-0524-00988. P.099097D (KAHNA) - BORE 3023' & TRENCH 182' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (25) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1462' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
Date Name
12/05/2024 Traffic Control set-up approved between 7AM - 5PM
12/05/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
12/06/2024 Approved for Work within City of Tucson Right of Way only.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1224-02268
Permit Description: Job previously approved under the original design TR-UTL-0524-00988. P.099097D (KAHNA) - BORE 3023' & TRENCH 182' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (25) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1462' OF AERIAL FIBER CABLE.
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/18/2025 TRSP - ROW - Barricade - Setup/Routine Passed
03/18/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/18/2025 TRSP - ROW - Barricade Takedown Passed
03/18/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
03/18/2025 TRSP - ROW - AERIAL INSTALLATION Passed
03/18/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.099097D - CITY OF TUCSON AERIAL MAP - 12-04-2024_V1.PDF DOCUMENTS VIEW
P.099097D - CITY OF TUCSON PLANS - 12-04-2024_V1.PDF DOCUMENTS VIEW
P.099097D - CITY OF TUCSON TCP - 12-04-2024_V1.PDF DOCUMENTS VIEW