Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1224-02266
Permit Details
Apply Date:
12/04/2024
Applicant:
Chelsey Bolinger
Description:
Job previously approved under the original design TR-UTL-0524-00987. P.099097C (KAHNA) - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1109' OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-1224-02266
Permit Status: Issued
Permit Description: Job previously approved under the original design TR-UTL-0524-00987. P.099097C (KAHNA) - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1109' OF AERIAL FIBER CABLE.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/04/2024 | RIGHT-OF-WAY REVIEW v.1 | 12/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1224-02266
Permit Status: Issued
Permit Description: Job previously approved under the original design TR-UTL-0524-00987. P.099097C (KAHNA) - BORE 552' & TRENCH 195' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (13) CABINET, HANDHOLES & PEDESTALS. OVERLASH 1109' OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
12/05/2024 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
12/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
12/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
12/05/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |