Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1223-03074
Permit Details
Apply Date:
12/15/2023
Applicant:
Chelsey Bolinger
Description:
KAHNA (Permit B) - BORE 2,974' & TRENCH 47' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) CABINETS, HANDHOLES & PEDESTALS
Permit Reviews
Permit Number - TR-UTL-1223-03074
Permit Status: Complete
Permit Description: KAHNA (Permit B) - BORE 2,974' & TRENCH 47' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) CABINETS, HANDHOLES & PEDESTALS
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/15/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/18/2023 | REQUIRES RESUBMIT |
01/02/2024 | RIGHT-OF-WAY REVIEW v.2 | 01/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1223-03074
Permit Status: Complete
Permit Description: KAHNA (Permit B) - BORE 2,974' & TRENCH 47' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) CABINETS, HANDHOLES & PEDESTALS
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
12/15/2023 | Traffic Control set-up approved between 7AM - 5PM |
12/15/2023 | Traffic control set-up approved between 9AM - 3:30PM |
12/15/2023 | Other Activities in the Area, Will need to Coordinate Traffic Control setup with Existing setups |
12/15/2023 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
12/15/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1223-03074
Permit Description: KAHNA (Permit B) - BORE 2,974' & TRENCH 47' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) CABINETS, HANDHOLES & PEDESTALS
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/30/2024 | TRSP - ROW - Final/Close-Out | Passed |