Permit: TR-UTL-1223-03055
Permit Details
Apply Date:
12/13/2023
Applicant:
BILL YACKLEY
Description:
Updated (1/24/2024) P.090270 Kahna - Trench 32' to Place CTL Conduit & Fiber Cable. Place(1) Fiber SAI Cabinet & (1) Handhole. Overlash 963' of Aerial Fiber Cable on Existing Poles. BORE 783' & TRENCH 28' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. (P.090270 (KAHNA))
Permit Reviews
Permit Number - TR-UTL-1223-03055
Permit Status: Complete
Permit Description: Updated (1/24/2024) P.090270 Kahna - Trench 32' to Place CTL Conduit & Fiber Cable. Place(1) Fiber SAI Cabinet & (1) Handhole. Overlash 963' of Aerial Fiber Cable on Existing Poles.
BORE 783' & TRENCH 28' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. (P.090270 (KAHNA))
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/20/2023 | APPROVED |
01/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1223-03055
Permit Status: Complete
Permit Description: Updated (1/24/2024) P.090270 Kahna - Trench 32' to Place CTL Conduit & Fiber Cable. Place(1) Fiber SAI Cabinet & (1) Handhole. Overlash 963' of Aerial Fiber Cable on Existing Poles.
BORE 783' & TRENCH 28' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. (P.090270 (KAHNA))
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
12/14/2023 | Bus stop/ Route |
12/14/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1223-03055
Permit Description: Updated (1/24/2024) P.090270 Kahna - Trench 32' to Place CTL Conduit & Fiber Cable. Place(1) Fiber SAI Cabinet & (1) Handhole. Overlash 963' of Aerial Fiber Cable on Existing Poles.
BORE 783' & TRENCH 28' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET & (1) HANDHOLE. (P.090270 (KAHNA))
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
03/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
03/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
03/06/2024 | TRSP - ROW - Final/Close-Out | Passed |