Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1168 S GEORGETOWN DR
Apply Date:
12/08/2023
Applicant:
Tucson Electric Power
Description:
WO T32872. TEP TO REPLACE 5 POLES. Work with in Alley easement, with all access effected.

Permit Reviews

Permit Number - TR-UTL-1223-03028
Permit Status: Complete
Permit Description: WO T32872. TEP TO REPLACE 5 POLES. Work with in Alley easement, with all access effected.
Start Date Submittal Complete Date Status  
12/08/2023 RIGHT-OF-WAY REVIEW v.1 12/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1223-03028
Permit Status: Complete
Permit Description: WO T32872. TEP TO REPLACE 5 POLES. Work with in Alley easement, with all access effected.
Total Outstanding Activity Conditions - 3
Date Name
12/11/2023 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced
12/11/2023 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
12/11/2023 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1223-03028
Permite Description: WO T32872. TEP TO REPLACE 5 POLES. Work with in Alley easement, with all access effected.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1223-03028
Permit Description: WO T32872. TEP TO REPLACE 5 POLES. Work with in Alley easement, with all access effected.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/15/2024 TRSP - ROW - Barricade Takedown Passed
05/15/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
05/15/2024 TRSP - ROW - Notice of Completion Passed
07/23/2024 TRSP - ROW - Barricade - Setup/Routine Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
MAP FOR PERMIT T32872_V1.PDF DOCUMENTS VIEW