Permit: TR-UTL-1222-00491
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2805 S PARK AV BLDG 1
Address NEW:
2805 S PARK AV BLDG 1
Apply Date:
12/22/2022
Applicant:
Caitlin Ripley
Description:
BORE 114' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-1222-00491
Permit Status: Complete
Permit Description: BORE 114' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/28/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/17/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-1222-00491
Permit Status: Complete
Permit Description: BORE 114' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
| Date | Description | Comments |
|---|---|---|
| 01/17/2023 | This project is within a floodplain. Completion of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. | |
| 01/12/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| 03/30/2023 | Sun Tran | |
| 01/12/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00491
Permite Description: BORE 114' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00491
Permit Description: BORE 114' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/24/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/01/2024 | TRSP - ROW - SITE INSPECTION | Passed |