Permit: TR-UTL-1222-00489
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1436 N CAMPBELL AV
Address NEW:
1436 N CAMPBELL AV
Apply Date:
12/22/2022
Applicant:
Bobbi Raymond
Description:
Starting on the West side of N Campbell Ave at TEP poll, Overlash.144 ct Fiber to existing East 150’ then North 964’ raise your down overpull through existing conduit 15 feet East for systems tie
Permit Reviews
Permit Number - TR-UTL-1222-00489
Permit Status: Complete
Permit Description: Starting on the West side of N Campbell Ave at TEP poll, Overlash.144 ct Fiber to existing East 150’ then North 964’ raise your down overpull through existing conduit 15 feet East for systems tie
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/24/2023 | RIGHT-OF-WAY REVIEW v.3 | 04/11/2023 | APPROVED |
| 02/05/2023 | RIGHT-OF-WAY REVIEW v.2 | 03/22/2023 | REQUIRES RESUBMIT |
| 12/28/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/26/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1222-00489
Permit Status: Complete
Permit Description: Starting on the West side of N Campbell Ave at TEP poll, Overlash.144 ct Fiber to existing East 150’ then North 964’ raise your down overpull through existing conduit 15 feet East for systems tie
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/12/2023 | BUS STOP |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00489
Permite Description: Starting on the West side of N Campbell Ave at TEP poll, Overlash.144 ct Fiber to existing East 150’ then North 964’ raise your down overpull through existing conduit 15 feet East for systems tie
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2023 | TRSP - ROW - Recurring | N/A | Re-inspection required | No activity |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00489
Permit Description: Starting on the West side of N Campbell Ave at TEP poll, Overlash.144 ct Fiber to existing East 150’ then North 964’ raise your down overpull through existing conduit 15 feet East for systems tie
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | TRSP - ROW - Final/Close-Out | Passed |