Permit: TR-UTL-1222-00453
Permit Details
Apply Date:
12/16/2022
Applicant:
Tucson Electric Power
Description:
WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer. See PI plans for details
Permit Reviews
Permit Number - TR-UTL-1222-00453
Permit Status: Complete
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/20/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/05/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-1222-00453
Permit Status: Complete
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details
Date | Description | Comments |
---|---|---|
01/05/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
01/05/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00453
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/13/2023 | TRSP - ROW - Recurring | Passed | ||
09/13/2023 | TRSP - ROW - Final/Close-Out | Passed |