Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Apply Date:
12/15/2022
Applicant:
Mike Culbert
Description:
Tucson Electric Power Company Irvington Gate 4 entrance. The concern is that the entrance is too narrow which is causing the back tires on line trucks and trailers to cut the corner. In order to make the turn in the utility vehicles they have to swing into oncoming traffic. We are hoping to be able to round out the corner more with asphalt to provide a more stable and wide entrance into the site.

Permit Reviews

Permit Number - TR-UTL-1222-00446
Permit Status: In review
Permit Description: Tucson Electric Power Company Irvington Gate 4 entrance. The concern is that the entrance is too narrow which is causing the back tires on line trucks and trailers to cut the corner. In order to make the turn in the utility vehicles they have to swing into oncoming traffic. We are hoping to be able to round out the corner more with asphalt to provide a more stable and wide entrance into the site.
Start Date Submittal Complete Date Status  
12/20/2022 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details