Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1222-00440
Permit Details
Apply Date:
12/15/2022
Applicant:
Tino Tarango
Description:
Site 4 - Install Approximately 424 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 8350-09 and MH 8350-10 per PCRWRD standard detail 211/212.
Permit Reviews
Permit Number - TR-UTL-1222-00440
Permit Status: Complete
Permit Description: Site 4 - Install Approximately 424 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 8350-09 and MH 8350-10 per PCRWRD standard detail 211/212.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/19/2022 | RIGHT-OF-WAY REVIEW v.1 | 01/04/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1222-00440
Permit Status: Complete
Permit Description: Site 4 - Install Approximately 424 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 8350-09 and MH 8350-10 per PCRWRD standard detail 211/212.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/30/2022 | Traffic control set-up approved between 9AM - 3:30PM |
Conditions
Permit Number - TR-UTL-1222-00440
Permit Status: Complete
Permit Description: Site 4 - Install Approximately 424 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 8350-09 and MH 8350-10 per PCRWRD standard detail 211/212.
Date | Description | Comments |
---|---|---|
12/30/2022 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00440
Permit Description: Site 4 - Install Approximately 424 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 8350-09 and MH 8350-10 per PCRWRD standard detail 211/212.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2023 | TRSP - ROW - SITE INSPECTION | Passed |