Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
103 N PARK AV
Apply Date:
12/14/2022
Applicant:
BEN LOZANO
Description:
Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment

Permit Reviews

Permit Number - TR-UTL-1222-00429
Permit Status: Complete
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Start Date Submittal Complete Date Status  
12/19/2022 RIGHT-OF-WAY REVIEW v.1 12/30/2022 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1222-00429
Permit Status: Complete
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Date Description Comments
12/30/2022 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
12/30/2022 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1222-00429
Permite Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/05/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Complete (Recurring)
01/24/2023 TRSP - ROW - SITE INSPECTION N/A Complete (Recurring) All work is complete. Temporary asphalt patch is in place. Permanent repairs still needed, patch will go all the way across the road.
01/30/2023 TRSP - ROW - Recurring N/A Complete (Recurring) Underground Work is completed. Concrete and asphalt repairs still needed.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1222-00429
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/10/2023 TRSP - ROW - Final/Close-Out Passed All underground work has been completed. Permanent asphalt patch has been installed. No further issues.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
103 N PARK AVE TCP_V1.PDF DOCUMENTS VIEW
103 N PARK AVE_V1.PDF DOCUMENTS VIEW