Permit: TR-UTL-1222-00429
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
103 N PARK AV
Address NEW:
103 N PARK AV
Apply Date:
12/14/2022
Applicant:
BORDER TRAFFIC SAFETY BEN LOZANO
Description:
Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Permit Reviews
Permit Number - TR-UTL-1222-00429
Permit Status: Complete
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2022 | RIGHT-OF-WAY REVIEW v.1 | 12/30/2022 | APPROVED |
Conditions
Permit Number - TR-UTL-1222-00429
Permit Status: Complete
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
| Date | Description | Comments |
|---|---|---|
| 12/30/2022 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| 12/30/2022 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00429
Permite Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Complete (Recurring) | |
| 01/24/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) | All work is complete. Temporary asphalt patch is in place. Permanent repairs still needed, patch will go all the way across the road. |
| 01/30/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) | Underground Work is completed. Concrete and asphalt repairs still needed. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00429
Permit Description: Installing 4" fire protection service, 1" water service with meter, and 1 system abandonment
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2023 | TRSP - ROW - Final/Close-Out | Passed | All underground work has been completed. Permanent asphalt patch has been installed. No further issues. |