Permit: TR-UTL-1222-00418
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
975 N CIRCLE D WY
Address NEW:
975 N CIRCLE D WY
Apply Date:
12/12/2022
Applicant:
Anthony Calderon
Description:
Need a right-a-way permit to cross Circle D Way road for power utilities. The transformer is on the east side of the street and we need to cross over to the west side of the street.
Permit Reviews
Permit Number - TR-UTL-1222-00418
Permit Status: Complete
Permit Description: Need a right-a-way permit to cross Circle D Way road for power utilities. The transformer is on the east side of the street and we need to cross over to the west side of the street.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/19/2022 | RIGHT-OF-WAY REVIEW v.1 | 12/29/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1222-00418
Permit Status: Complete
Permit Description: Need a right-a-way permit to cross Circle D Way road for power utilities. The transformer is on the east side of the street and we need to cross over to the west side of the street.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/29/2022 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00418
Permite Description: Need a right-a-way permit to cross Circle D Way road for power utilities. The transformer is on the east side of the street and we need to cross over to the west side of the street.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Canceled | |
| 02/09/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1222-00418
Permit Description: Need a right-a-way permit to cross Circle D Way road for power utilities. The transformer is on the east side of the street and we need to cross over to the west side of the street.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2023 | TRSP - ROW - SITE INSPECTION | Passed |