Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
300 S TOOLE AV
Address NEW:
300 S TOOLE AV
Apply Date:
11/24/2026
Applicant:
Aidan Willis
Description:
Previously Approved Permit (TR-UTL-0826-01463) Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.

Permit Reviews

Permit Number - TR-UTL-1126-01997
Permit Status: In review
Permit Description: Previously Approved Permit (TR-UTL-0826-01463) Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.
Start Date Submittal Complete Date Status  
11/24/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1126-01997
Permit Status: In review
Permit Description: Previously Approved Permit (TR-UTL-0826-01463) Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.
Total Outstanding Activity Conditions - 4
Date Name
11/25/2026 Traffic control set-up approved between 9AM - 3:30PM
11/25/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
11/25/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
11/25/2026 PROOF OF NOTIFICATION IS REQUIRED. AT THE TIME OF THE PRECONSTRUCTION MEETING