Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
2514 E GRANT RD
Address NEW:
2514 E GRANT RD
Apply Date:
11/11/2026
Applicant:
Cox Communications
Description:
PRJ319649-1: Cox to overlash 1,079' of 144ct CATV fiber, then continue onto private property for system tie.

Permit Reviews

Permit Number - TR-UTL-1126-01946
Permit Status: In review
Permit Description: PRJ319649-1: Cox to overlash 1,079' of 144ct CATV fiber, then continue onto private property for system tie.
Start Date Submittal Complete Date Status  
11/13/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details
11/18/2026 RIGHT-OF-WAY REVIEW v.2 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1126-01946
Permit Status: In review
Permit Description: PRJ319649-1: Cox to overlash 1,079' of 144ct CATV fiber, then continue onto private property for system tie.
Total Outstanding Activity Conditions - 7
Date Name
11/18/2026 Traffic control set-up approved between 9AM - 3:30PM
11/18/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
11/18/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
11/18/2026 PROOF OF NOTIFICATION IS REQUIRED. AT THE TIME OF THE PRECONSTRUCTION MEETING
11/18/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
11/20/2026 Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.
11/20/2026 The sidewalk shall remain open and ADA compliant at all times during construction. Crew- or worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained, an approved pedestrian detour shall be implemented before the sidewalk is closed.