Permit: TR-UTL-1126-01935
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
915 S BEAN AV
Address NEW:
915 S BEAN AV
Apply Date:
11/09/2026
Applicant:
Patty Noel - Ajax Barricade Co
Description:
Street cut for Sewer main tap to provide a new HSC to 915 S Bean Av Tucson,AZ 85711
Permit Reviews
Permit Number - TR-UTL-1126-01935
Permit Status: In review
Permit Description: Street cut for Sewer main tap to provide a new HSC to 915 S Bean Av Tucson,AZ 85711
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/17/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | IN REVIEW |
| 11/12/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1126-01935
Permit Status: In review
Permit Description: Street cut for Sewer main tap to provide a new HSC to 915 S Bean Av Tucson,AZ 85711
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/17/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 11/17/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 11/17/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 11/17/2026 | PROOF OF NOTIFICATION IS REQUIRED. AT THE TIME OF THE PRECONSTRUCTION MEETING |